How to write a method statement that gets accepted first time.

Most rejected method statements fail the same way: generic text that could describe any site, steps out of order, and controls that never make it into the sequence. Here is the structure a principal contractor expects to see. If you would rather spend the evening pricing work than writing paperwork, SITEPAPERS writes it for you from a ten-question intake.

✓ SMSTS professional sign-off ✓ £1,000,000 professional indemnity ✓ Back in 24h
§ 01

The structure that passes review

Written to: HSWA 1974 section 2, MHSWR 1999 regulation 3, HSE guidance on safe systems of work. Every document is job-specific; padding is what gets paperwork rejected.

§ 02

How it works

1

Order and tell us the task

£89 fixed, paid securely by card, Apple Pay or Google Pay. Then a ten-question intake: the job, the site, your crew and plant, anything unusual.

5 minutes
2

Written, then signed off

Your RAMS, method statement included, is written for that exact task and reviewed by an SMSTS qualified professional with years running live UK sites.

Within 24h
3

Send it, get approved, start

Branded PDF plus editable Word, one revision round included. If the principal contractor comments, we turn the revision around.

PDF + DOCX
§ 03

Questions, answered

Is there an official format?
No. Any format works provided the content is there: job facts, sequence with embedded controls, plant and competence, PPE and emergency arrangements. Principal contractors judge content, not fonts.
What gets method statements rejected most often?
Generic text that was clearly written for another job, the wrong site address surviving a copy-paste, hazards listed without controls in the sequence, and no named supervision or briefing arrangements.
How long does it take to write one properly?
From scratch, an evening if you know the task well. Our route: a ten-question intake in about fifteen minutes, then the written document back inside 24 hours with an SMSTS professional's review already done.
Fixed rate, no subscription

Your method statement is inside a full RAMS, back within 24h of your completed intake.

Order now · £89

Also available: the construction phase plan £199 and the full site pack £349

Method statement guides:

What is a method statement · How to write one · Vs risk assessment · Template vs bespoke · Construction method statements · Work method statements

Bespoke RAMS · 24h£89 fixedOrder now